top of page

The Ballard Group, Inc.

High Plains School

The Ballard Group provided the mechanical and plumbing system design on this design/build geothermal project. The project scope was design engineering the HVAC and plumbing systems for this new Pre-K - Grade 12 school with classrooms, gym, lockers, science rooms etc. The main mechanical system that was designed and installed is a geothermal system utilizing water source heat pumps with ducted ventilation air from dedicated, outside air, heat recovery ventilators. This system features the use of a deep bore geothermal exchanger field used to reject heating during the cooling season and to claim heat during the heating season.

About this Project

Square Feet

51,000

Year Built

2014

Location

Seibert, CO